EVALUATION AND IMPLEMENTATION STRATEGY OF SLUM HANDLING CASE STUDY LOMBOK DISTRICT EAST NUSA TENGGARA BARAT

Authors

  • Ahmad Amrullah Master of Civil Engineering, Faculty of Engineering, University of Mataram
  • Akmaluddin Akmaluddin Master of Civil Engineering, Faculty of Engineering, University of Mataram
  • Suryawan Murtiadi Master of Civil Engineering, Faculty of Engineering, University of Mataram

DOI:

https://doi.org/10.53625/ijss.v2i4.4716

Keywords:

Evaluation, Strategy, SWOT, AHP, Implementation, Handling.

Abstract

The Uninhabitable Houses Program (RTLH) is a DPRRI Commission VIII program in partnership with the Ministry of Social Affairs. The RTLH processing that will be carried out in 2021 will be divided into several sub-districts in East Lombok Regency, namely Sakra, East Sakra, West Sakra, Keruak and Jerowaru Districts. However, due to budget constraints, especially the Covid 19 outbreak in 2021, the proposal could not be completed, so it was rescheduled in 2022 to complete the RTLH in East Lombok Regency which is in several of the same sub-districts. The purpose of this research is to determine the priorities for the construction of infrastructure for uninhabitable housing (RTLH) and to determine the weight of the criteria that influence decisions in determining where assistance is prioritized. Evaluation of the management of the 2021 RTLH in several districts/cities is carried out on the development process of RTLH both from the inhibiting factors and the supporting factors. The evaluation of the Uninhabitable Houses Reconstruction Program (RTLH) includes determining the target beneficiaries, the process of implementing the RTLH program, evaluating the reporting of the results of the implementation of the RTLH program. Internally, the inhibiting factor for the implementation of the RTLH program is the lack of competent staff to prepare reports, while externally there is a shortage of construction workers. An uninhabitable house, hereinafter referred to as RTLH, is a place to live that does not meet health, safety and social requirements. Therefore, East Lombok Regency requires special treatment in building uninhabitable houses to overcome the problem of slum settlements

References

Athmaja H.J., 2021, Factors Influencing Consumer Satisfaction Levels in Subsidized Housing in West Lombok Regency.

Ghafarali, 2013.Implementation of the Uninhabitable House Program (RTlh) in Tebing District, Karimun Regency in 2013.FISIP UMRAH. Essay.

Hamdy, A., 2020, Implementation of the Uninhabitable House Rehabilitation Program in Asahan District in 2019.

Ninik, H., 2014.Listening To The Lives Of The Muskin Family,Journal of Social Analysis Vol. 14 No. 2 September 2014.

Rosmita, M.F., 2019,Community Response to the Implementation of the Uninhabitable House Assistance Program (RTLH) from the Social Service in Mungka District, Fifty Cities District, West Sumatra Province.Research Journal of Dakwah and Communication Students, Riau: State Islamic University of Sultan Syarif Kasim Riau. Journal Vol. 1 No. 1 of 2019, pg. 214-221 i.

Syamsuri, K., 2022,Study of Supplier Selection Instruments Using the Analytical Hierarchy Process (AHP) Method.

Saifullah, 2019,Analysis of Damage Level and Repair Priority in Elementary School Buildings in Central Lombok District with the AHP Method.

Downloads

Published

2023-01-12

How to Cite

Ahmad Amrullah, Akmaluddin, . A., & Suryawan Murtiadi. (2023). EVALUATION AND IMPLEMENTATION STRATEGY OF SLUM HANDLING CASE STUDY LOMBOK DISTRICT EAST NUSA TENGGARA BARAT. International Journal of Social Science, 2(4), 2033–2044. https://doi.org/10.53625/ijss.v2i4.4716

Issue

Section

Articles